Yantai Shunkang Biotechnology Co., Ltd. First Information Disclosure on Environmental Impact Assessment of Pharmaceutical Intermediate Product Production Projects
Release time:
2022-05-26
Project name: Yantai Shunkang Biotechnology Co., Ltd. Pharmaceutical Intermediate Product Production Project
1. Project overview
Project name: Yantai Shunkang Biotechnology Co., Ltd. Pharmaceutical Intermediate Product Production Project
Construction site: Provincial Chemical Park, Dongshou, Emei Road, Economic and Technological Development Zone, Laiyang City
Constructive nature: expansion
Construction content: The site of this project is located at No. 2 Emei Road, Economic and Technological Development Zone, Laiyang City, Yantai City, Shandong Province, covering an area of 74,800 m2, and the company plans a total construction area of 45,000 m2.The existing phase I project mainly builds three pharmaceutical chemical synthesis workshops, with an annual output of 100 tons of 1,2,3-triacetyl-5-deoxy-β-D-ribose, 10 tons of L-2-deoxyribose, and 50 tons of 2-deoxy-D-ribose; the first phase of the project has been completed and put into operation.The current construction project plans to build a new reaction plant and supporting auxiliary facilities in the existing plant area. The product scale is 500 tons of 1,2,3,4-tetrahydropyrazine and [1,2-A] indole, 25 tons of 1-methyl-3-propylpyrazole-5-dicarboxylic acid, and 100 tons of 4-acetamide-3-methoxy-fluorobenzene.
2. The name and contact information of the construction unit
Construction unit: Yantai Shunkang Biotechnology Co., Ltd.
Contact: Gao Hua
Contact number: 05357876609
E-mail:shunkang ytsk.com.cn
3. The name and work content of the unit preparing the environmental impact report
EIA unit: Yantai Environmental Protection Engineering Consulting and Design Institute Co., Ltd.
Working procedures and content: After accepting the commission of the construction unit, carry out environmental impact assessment work in accordance with relevant national laws and regulations, technical guidelines and standards, etc., through on-site investigation, data collection, and based on the research report provided by the construction unit, conduct an environmental impact assessment of the wastewater, exhaust gas, noise, solid waste, etc. that may be generated during the operation of the construction project, propose governance measures and conduct technical and economic feasibility demonstrations, and finally give the environmental feasibility evaluation conclusions of the project and prepare an environmental impact report.
4. Network link to the public comment form
In order to listen to the opinions and suggestions of all walks of life on the environmental protection work of this project, the relevant environmental information of this project is specially publicized to solicit valuable opinions and opinions from the public.The public can check and download the public comment form for construction projects on this announcement page.
5. Ways and means of submitting public comment forms
The public can submit the completed “Public Comment Form on Construction Projects” to the construction unit by letter, fax or e-mail to express their views or opinions on the environmental protection work of the project.When the public submits comments, please provide valid
The contact information.
In the process of preparing the draft environmental impact report for solicitation of comments, the public can submit opinions related to the environmental impact assessment to the construction unit.
Related News
Related accessories
